General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT

General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT

This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.

Expected Fee

$120

Estimated Processing Time

12 Months

How to Obtain This Permit

Step 1

Submit complete General NPDES Permit Form for Discharge of Treated Storm Water

Download Permit Files

Please download forms below by clicking on the download icon.

  • * NOTICE OF INTENT (NOI) FOR THE DISCHARGE OF STORMWATER AND HYDROSTATIC TEST WATER FROM OIL TERMINALS TO SURFACE WATER OR GROUNDWATER OF THE STATE File
    Download

Want to apply for the permit?

Want to Learn More?

Contact the following staff members for more information:

Brad Barzin

Oil Control Program - AST & Permits Division

[email protected]
(410) 537-3442

General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT

This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.

Expected Fee

$120

Estimated Processing Time

12 Months

How to Obtain This Permit

Step 1

Submit complete General NPDES Permit Form for Discharge of Treated Storm Water

Want to apply for the permit?

Want to Learn More?

Contact the following staff members for more information:

Brad Barzin

Oil Control Program - AST & Permits Division

[email protected]
(410) 537-3442