General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT
General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT
This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.
Expected Fee
$120
Estimated Processing Time
12 Months
How to Obtain This Permit
Step 1
Submit complete General NPDES Permit Form for Discharge of Treated Storm Water
Download Permit Files
Please download forms below by clicking on the download icon.
-
* NOTICE OF INTENT (NOI) FOR THE DISCHARGE OF STORMWATER AND HYDROSTATIC TEST WATER FROM OIL TERMINALS TO SURFACE WATER OR GROUNDWATER OF THE STATE FileDownload
Want to apply for the permit?
Want to Learn More?
Contact the following staff members for more information:
General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT
This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.
Expected Fee
$120
Estimated Processing Time
12 Months
How to Obtain This Permit
Step 1
Submit complete General NPDES Permit Form for Discharge of Treated Storm Water